Catalog of specifications describing water and waste water equipment.
Wednesday, May 16, 2012
SECURITY
SECURITY
PART 1 - GENERAL
1.1 SECURITY PROGRAM
A. The Contractor shall:
1. Protect work existing premises and Owner’s operations from theft, vandalism, and unauthorized entry.
2. Initiate program in coordination with Owner’s existing security system at job mobilization.
3. Maintain program throughout construction period until demobilization.
1.2 ENTRY CONTROL
A. The Contractor shall:
1. Allow entry only to authorized persons with proper identification.
2. Maintain log of workmen and visitors and make log available to Owner on request.
B. Owner will control entrance of persons and vehicles related to Owner’s operations.
1.3 PERSONNEL IDENTIFICATION
A. The Contractor shall:
1. Provide identification card to each person authorized to enter premises.
2. Maintain a list of authorized persons and submit copy to Owner on request.
3. Require return of cards.
B. Card shall include: personal photograph, name and employer.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment