SECTION 40 61 13
PROCESS
CONTROL
SYSTEM GENERAL
PROVISIONS
PART
1 –
GENERAL
1.1
DESCRIPTION
A.
Scope:
1. CONTRACTOR shall
provide all labor,
materials,
equipment,
and incidentals as shown, specified, and required to furnish,
install, calibrate, test, start-up
and
place in
satisfactory
operation the
components
of the Monitoring and Control System
(MCS)
that
are associated with the Primary
Treatment
Improvements
Project as required for a fully functioning system as specified and
shown on the Drawings.
2. CONTRACTOR is
responsible for obtaining the services of ALL SUPPLIERS. The term
“SUPPLIERS”
includes SYSTEM INTEGRATORS, MANUFACTURER’S REPRESENTATIVES,
vendors, and all other personnel required for a complete
MCS and the requirements
listed or implied
in the Contract
Documents.
3.
The
MCS Work includes, but is not limited
to, the following:
a.
Panels
and panel-mounted
instruments
and devices. b.
Field-mounted
instruments
and devices.
c. Programmable
automation
controllers
(PAC) and
software (formerly
known as programmable
logic
controllers (PLC).
d.
Operator
Interface
Terminals
(OIT).
e. Personal
computers and human-machine
interface
(HMI) hardware
and software.
f.
Local
area network hardware and software. g.
Uninterruptible
power supply.
h.
All
interconnecting wires and cables
i. Field device
network communication
hardware and software required for interfacing various systems
to
provide
a fully-integrated system.
j. Modbus RTU
network communication
hardware
and software required for monitoring
various field instruments
and sensors.
4. CONTRACTOR shall
program
the
PACs, OITs
and
Human
machine
Interfaces (HMI) as required
for complete
control and monitoring
of the Primary
Settling Tank processes, including interlocks and data transfer. The
control description of the
systems
and associated equipment
are included in Section 40 61 96 and shall be the basis for the PAC,
OIT, and HMI programming
along with the process
and
instrumentation diagrams.
5. CONTRACTOR shall
provide the HMI software developer licenses for Work on the project.
The OWNER
already
is in possession of the HMI runtime
licenses.
B. MCS shall
monitor, store, display, and log process and equipment
operating information;
perform
various
process control
functions; and generate various reports.
C. The Contract
Documents
describe the required MCS and MCS functions and operational
requirements.
D.
Coordination:
1.
Instrumentation
and Controls:
a. CONTRACTOR shall
coordinate installation
of panels and equipment
that interfaces with the
Monitoring
and
Control system
and
that are furnished under other Specification
Sections
under this Contract. Coordinate with SUPPLIERS of
these
panels and equipment
to provide fully functional system
in
accordance
with the Contract Documents.
b. CONTRACTOR shall
provide PAC input/output
lists to identify
inputs and outputs for all PACs.
c. CONTRACTOR shall
coordinate and
provide PAC
register lists to identify all soft inputs and outputs being
communicated
to/from all PACs. This information
shall be in the format
required by Section 40
61 93.
2. With
CONTRACTOR, SUPPLIERS shall
assume
the responsibility
for
adequacy and performance
of materials
and equipment
provided under this Section.
3.
Provide
I&C materials
and equipment
from a
single manufacturer.
4.
CONTRACTOR’s
Responsibilities:
a. Hiring
SUPPLIER’s (including SYSTEMS INTEGRATORS)
to provide the technical expertise to perform
relevant
tasks listed below and in the Contract
documents.
b. Preparing all
process
control
equipment
submittals
in accordance
with the Contract Documents.
c. Proper
interfacing
of instrumentation
and control equipment
with field equipment,
instruments,
devices,
and
panels,
including
required
interfacing with packaged
control
systems
furnished by SUPPLIERS, and required interfacing with the Site’s
electrical system.
d. Review and
coordination with manufacturers,
SUPPLIERS, and
other contracts of Shop Drawings and submittals
for equipment,
valves, piping, and appurtenances for ensuring
proper interfacing of hardware, and locations and installation
requirements
of inline devices and instrument
taps.
e. Direct, detailed
oversight of installation
of instruments,
panels, consoles, cabinets, wiring and other components,
and related wiring and piping connections.
f. Calibrating,
source quality control, field
quality control, and start-up of the system.
g.
Responsibility for correction period
obligations for the MCS.
h. Training
operations and maintenance
personnel in operation and maintenance
(including calibration and
troubleshooting) of the MCS.
E.
Related
Sections:
1.
Division
26.
2.
Division
40.
1.2
REFERENCES
A.
Standards
referenced in this Section are:
1.
American
National Standards Institute, (ANSI).
2.
The
International Society of Automation,
(ISA).
3.
Underwriters’
Laboratories, Inc., (UL).
4.
National
Fire
Protection Association, (NFPA).
5.
American
Water Works
Association,
(AWWA).
6.
National
Electrical
Manufacturer’s
Association, (NEMA).
7.
Occupational
Safety and Health
Administration, (OSHA).
8.
Institute
of Electrical and
Electronic
Engineers,
(IEEE).
9.
National
Electrical
Code, (NEC).
10.
Factory
Mutual, (FM).
1.3
QUALITY
ASSURANCE
A.
General:
1. Each major
component
system
of the
MCS as
specified shall be furnished by a SUPPLIER who shall assume
responsibility
for providing a complete
packaged system.
2. Coordination of
all SUPPLIERS, and the overall MCS, shall be the responsibility of
the CONTRACTOR, who shall assume
responsibility for providing the complete
MCS.
3. All equipment,
components,
and materials
required for each major
system shall be furnished by a single SUPPLIER who shall assume
the responsi- bility for adequacy and performance
of all items.
B.
SUPPLIER
qualifications:
1. Be a financially
sound firm
having
at least
five years continuous experience in designing, implementing,
supplying,
and supporting instrumentation
and control
systems
that are comparable
in complexity
to the hardware
and software of the MCS.
2. Have in existence
at the time
of bid
advertisement,
an experienced engineering and technical staff capable of designing,
implementing,
supplying and supporting the controls and monitoring,
and handling submittal
and
training
requirements
for the respective
major
equipment.
3. Have a minimum
of
five
years
experience
in hardware application and programming
of microprocessor
based
controllers and data highway systems,
including DeviceNet, Ethernet, and Modbus.
4. Provide standard
course offerings in
general
process control
applications
and in
operation, programming
and maintenance
of the control system
and
equipment
at a facility
specifically
utilized
for
training
purposes.
The facility
shall have been in operation continuously
for the last two years.
5. Have a thorough
working knowledge of wastewater
treatment
processes
and
control philosophy in accordance with standard
practices of the wastewater treatment
industry.
6.
Have a
UL-approved panel shop.
7. Submit
for approval documentation
demonstrating
compliance
with the
above requirements.
8.
Possess
and maintain
a documented
program
of
failure analysis.
C.
SYSTEMS
INTEGRATOR
qualifications
shall
be in accordance
with Paragraph
1.3.B. above. If
the SYSTEMS INTEGRATOR
is not frabicating
any control panels, then Paragraph 1.3.B.6 shall not
apply to the SYSTEMS INTEGRATOR. In addition, the SYSTEMS INTEGRATOR
shall meet
the following requirements:
1.
Shall
be a Rockwell
listed and certified
Solution
Provider
(preferred),
or
a
Rockwell-listed
System
Integrator.
2. Shall have ISO
9001 certification.
If
lacking
the
9001
certification,
the
OWNER
reserves the
right
to review
the
quality management
procedures
and perform a quality management
audit prior to the preconstruction conference.
3.
Preferred
certified by the Control System
Integrator
Association (CSIA).
4. SYSTEM INTEGRATOR
shall be Wonderware
endorsed or certified in Wonderware System
Platform
3 or
current
version of System Platform.
Personnel selected for the
Contract
must
demonstrate
recent System Platform
3 (or
current version)
programming
experience.
5. The SYSTEMS
INTEGRATOR shall have an office fully staffed with project personnel
within
250 miles
of the Cleveland,
Ohio project location.
D.
Manufacturers:
1. Manufacturers of
instrumentation
and control equipment
furnished for the MCS shall be experienced producing similar
equipment
and shall have the following
qualifications:
a. Shall manufacture
instrumentation
and
control system
components
that are fully-developed, field-proven, and
of standardized designs.
b. Shall have system
of
traceability
of
manufactured
unit through
production and testing in
accordance
with ANSI/ASQ Z1.4.
c. Shall have
guaranteed availability
clause (99.99 percent, minimum
for
one year) for microprocessor-based
components
and appurtenances.
d. Shall have
documented
product safety policy relevant to materials
and equipment
proposed for the Work.
E.
CONTRACTOR
Responsibility:
1. CONTRACTOR shall
retain
the SUPPLIERS
(which
includes SYSTEMS
INTEGRATOR and related personnel) to undertake the responsibilities
specified below. However, execution
of these specified
duties by the
SUPPLIERS shall not
relieve
CONTRACTOR
of the ultimate
responsibility
for
the components
and full
functionality
of the
MCS.
a. Design,
fabrication, implementation
and applications programming of the PAC panels, OITs, and HMIs and
all
subsystems
in accordance with the Contract Documents
and all referenced standards
and codes.
b. Preparation,
assembly
and correction
of all
control panel
submittals
in
accordance with the Contract
Documents.
c. Proper
interfacing
of all hardware,
software,
field devices,
and panels, including required interfacing
with packaged
control
systems
furnished by other SUPPLIERS, and
with the
plant
electrical system.
d. Detailed
configuration, loop checks,
testing,
troubleshooting,
commissioning
of instruments.
e. Supervision of
the installation of
all
instruments,
panels, consoles, cabinets, wiring and other components
required.
f.
Calibration,
testing and start-up of all control panels.
g.
Training
of
OWNER’s
personnel
in
operation and maintenance
of the
MCS.
h. Responsibility
for all warranty obligations
for the control system components.
i. Maintenance of
two reproducible
copies
of the respective system documents
at the SUPPLIER's
facilities
for the duration of the warranty period.
j. Programming
of the PACs, HMIs, and associated OITs used in the MCS in accordance
with the Drawings and Specifications included in the Contract
Documents.
1.4
PROGRESS
AND COORDINATION MEETINGS
A. CONTRACTOR shall
be responsible for scheduling and coordinating the MCS installation
with regard to all other
Work on the Site
and in
accordance
with the provisions
of
the
General
Conditions.
Said coordination
shall
be documented
on the Project Schedule.
B.
Routine
progress
and coordination
meetings
will be scheduled
by ENGINEER.
CONTRACTOR and a
representative
of the SYSTEM INTEGRATOR and
SUPPLIERS shall be required to attend scheduled meetings
each month
during active work periods (shop drawing preparation,
construction, and startup).
C. The purpose of
the meetings
shall be to review the progress of the Work
involving the MCS and associated control
equipment
and provide coordination for installation
of the
equipment
to ensure Project Schedule is met.
D. Representative at
the
meetings
shall
have
the competence
and
authority to make
any and all necessary decisions. Decisions and statements
made
at the
meetings
shall commit
CONTRACTOR
and SUPPLIERS
to agreed procedures and schedules.
E.
Pre-submittal
Conference
1. Schedule and
conduct a pre-submittal
conference
for the MCS within 90 days after the Contract Times
commence
running.
2. Required
Attendance for Pre-submittal
Conference:
CONTRACTOR, SYSTEM INTEGRATOR,
SUPPLIERS,
ENGINEER,
and OWNER. Pre- submittal
conference
will be 8 hours.
Conference
will be held
at the
Project
Site.
3. Purpose of
pre-submittal
conference
is to review
manner
in which the CONTRACTOR intends to comply
with requirements
of the
Contract
Documents
before submittals are prepared.
CONTRACTOR
shall also provide for
review
at the pre-submittal
conference
standard
testing
and verification
procedures
in advance of
the
formal
submittal.
4. Bring to
pre-submittal
conference list of proposed
personnel committed
to assignment
to the Project. List shall include SYSTEM INTEGRATOR
project manager,
project engineer, field
representative,
local
service
representative, and sales representative(s); and similar
personnel for the SUPPLIER.
Indicate
addresses of
personnel
not based at SYSTEM
INTEGRATOR’s
and SUPPLIER's office
nearest to the
Site.
5.
CONTRACTOR
shall prepare items
listed
below
for
presentation at
pre-submittal
conference.
Submit
information
to ENGINEER two weeks prior to pre-submittal
conference.
a. List of materials
and equipment
required
for MCS, and manufacturer
and model
proposed for each item.
b.
List
of currently-known requests
for interpretations of which
CONTRACTOR is
currently aware.
c. List of proposed
exceptions to the Contract
Documents
along with brief explanation of each. Approval
shall
be
subject to a formal submittal.
d.
Proposed
MCS network architecture diagram.
e. Sample
of each type of process control
submittal
required by the Contract Documents.
These may
be submittals
prepared
for
other projects.
f.
List
of proposed
submittals.
See
Specification Section 01 33 00,
Submittal
Procedures,
for
general
submittal
requirements.
g. CPM type schedule
for
all control
related
activities from
pre-submittal
conference through start-up and training.
Particular emphasis
shall be given to dates relative to
submittals,
design, fabrication, programming,
factory testing, deliveries, installation, and field-testing. The
schedule shall be
subdivided
to show
activities relative to
each
major
item
or
group of items
when everything in a given group is on the same
schedule.
h. General outlines
of types of tests to be performed
to verify that all sensors
and
transducers,
instruments,
and digital processing equipment
are functioning properly.
i.
Sample
drawings
j.
Sample
OIT and HMI graphics
k.
Sample
programming
documentation.
1.5
MANDATORY
COORDINATION
WORKSHOPS
A. Standards
Workshops: The OWNER desires HMI
and OIT systems
that meet
the District Standards and that and similar
in
“look
and feel” to the District-wide HMI systems.
To that end, the CONTRACTOR is required to attend and implement
results from
multiple
workshops
with the OWNER.
The purpose of the workshops will be to review
the District
Automation
Standards
and discuss
their specific
application
to this project.
The District
makes
available PAC, OIT, and HMI
object libraries
(for use in
their
respective
programming
software)
which
shall
be
the basis for all of the new and modified
MCS content. The following
workshops will be held,
attended
by the
CONTRACTOR and OWNER
and OWNER
REPRESENTATIVE(S) to further define
and
detail to the CONTRACTOR
the District Standards and method of display
and
control. Each workshop shall be for at least four (4) hours and
no more
than
eight
(8) hours. The workshops will be scheduled by the OWNER
and OWNER’s PROGRAM MANAGER and will be scheduled prior
to the first
Factory Test.
The CONTRACTOR, SYSTEMS INTEGRATOR, and applicable SUPPLIERS
shall
be required to attend. Where the OWNER
has defined
standards,
examples
and templates
will be distributed
at the workshops.
(Note: The
following
list
is intended
to provide
the CONTRACTOR with an indication of the number
and content of each workshop. The OWNER reserves the right
to change the
order, add to or modify
the
content
of any workshop as required.)
1.
Standards
Workshop 1: PAC Programming:
a. Tag Standards
(Review with OWNER
the method
of tagging different types of I/O, specific to the project)
b. Documentation
Standards (Review with OWNER
the requirements
for
documenting
logic development
and
annotating program),
including electronic and paper documentation.
c. Logic Development
Standards
(Review
with OWNER which logic shall be developed in ladder logic and which
shall be developed in structured
text)
d.
Structured
subroutines
e. PAC programs
shall require the use
of
extensive
and
detailed
rung,
module, and procedure comments.
I/O tags with a description shall be used in the program.
District Automation
standards are published which document
programming requirements
and shall be followed.
2.
Standards
Workshop 2: OIT Configuration
a. Graphic Standards
(Review
with OWNER color, faceplate, display requirements
for local OITs)
b. Event and
Alarming
requirements
(Review
with OWNER methods to displaying alarms
at local OITs)
c. Control Function
requirements
(Review
with OWNER hierarchy of control,
format
for local/remote/manual
controls capabilities)
d.
Standard
screen layout
e. CONTRACTOR shall
submit
sketches
of
proposed graphic screens to ENGINEER and OWNER
two weeks before workshop, for ample time
to review and comment on the direction of the design effort
3.
Standards
Workshop 3: HMI Graphics
Configuration Part I
a. Graphic Template
(Review
with OWNER
the template
for
screen display, location
of
global/local
information),
HMI server
application.
b. Hierarchy (Review
with
OWNER
the hierarchy for
system
linking
on the project, including overviews, main
menus,
sub
menus,
context
sensitive menus,
etc.)
c. Graphic Display
Wizards/Galaxies
(Review with
OWNER
required symbols
to be used for field devices/equipment,
and how different status/alarms
would be displayed)
d. Colors (Review
with OWNER
color requirements
for systems/processes)
4.
Standards
Workshop 4: HMI Graphics
Configuration Part II
a. Alarm
and
Event Handling (Review with OWNER
the escalation and display requirements
for events
and
alarms,
including grouping, priorities,
and
method
of annunciation.)
b. Security Access
Levels (Review with OWNER the
security login function that
will
be configured,
including
access
levels, rights and privileges.)
Implement
OWNER specific requirements
for network security items,
including hardware
and software configuration, passwords, security levels, boot
requirements,
etc.
5.
Standards
Workshop
5: Historical Information
a. Process Trending
(Review with OWNER the required data to be trended, and the frequency
of collection for MCS data)
b. Alarm
and
Event Capture (Review with OWNER the required
alarms
and events to captured
within the
MCS Historian)
6.
Standards
Workshop 6: Regulatory Items
a.
Review
with
OWNER
the specific requirements
for regulatory
systems,
including alarm
handling
for
regulatory alarms,
data handling for regulatory systems,
formats
of reports, etc.)
B. Project
Workshops:
The OWNER desires
to review and comment
on each HMI system
graphic
and bring together Operations and Maintenance staff to review use and
application of the MCS HMI. To that
end, the CONTRACTOR is required to demonstrate
(either in person or over the internet
via remote
shared
desktop/meeting
capability)
each control
strategy and its related HMI graphics. The purpose of the workshops
will be
to allow OWNER stakeholders to review and comment
on the representation of process equipment,
process flows, information
requirements,
placement
of objects on
the screen,
etc.
All comments
will be compiled
and the
CONTRACTOR shall
be expected to respond to and implement
changes. For each system
defined
below,
the CONTRACTOR is expected
to
provide
a
(4)-hour
First
Demonstration,
and (2) hour Second Demonstration,
and a (2) hour Final
Demonstration.
At the meeting, the SYSTEMS INTEGRATOR,
as well as the respective SUPPLIER, shall attend. There will be
Control Strategy/Graphic
Reviews
for the following systems:
(Note: The following
list is intended
to
provide the CONTRACTOR with an indication of
the
number
and content
of each workshop. The OWNER reserves the right to change the order,
add to or
modify
the
content
of any workshop as required.)
1.
Primary
Settling Tanks (PST) 1 through 6
1.6 SYSTEMS
INTEGRATOR
PROJECT
PERSONNEL
A.
CONTRACTOR
shall provide the following project personnel:
1.
Project
Manager:
a. The CONTRACTOR
shall appoint
a Project Manager who shall coordinate and schedule all the Work
and assure that the Project
Schedule is met.
b. The Project
Manager shall act as
the
liaison
with
CONTRACTOR
for
the installation of the MCS equipment
and shall
assist
in all
matters
required for proper coordination and interfacing of the equipment
and processes.
2.
Field
Engineer:
a. The CONTRACTOR
shall appoint
a Field Engineer with responsibilities as follows:
1) Provide advice
and technical consultation
relative
to installation
techniques and procedures for equipment
furnished.
2) Installed system
checkout,
calibration,
adjustment,
and start-up, including tuning of every
control loop.
3)
Maintenance
services during
availability
demonstration.
4)
Involvement
in the on-site system
training
of plant personnel.
5) Resolving of
control problems
encountered during initial start-up and testing of all MCS equipment.
b. The Field
Engineer
shall have a minimum
of five years experience in systems
engineering and start-up
and
shall have a thorough working knowledge of both the hardware and
software supplied.
3.
Training
Personnel:
a. Comply
with requirements
of Section 40 61 26, Process
Control System Training,
and Section 01 79 00, Instruction
of Operations and Maintenance Personnel.
Training can be segmented
by major
systems
and common systems.
1.7
SUBMITTALS
A.
Action
Submittals:
Submit
the following:
1.
Shop
Drawings:
a.
General:
1) Shop Drawings
preparation shall
not commence until after the
pre- submittal
conference
specified
below.
2) Manufacture
of
a part
of the
MCS shall not
commence
until related
submittals
have been approved
by ENGINEER.
3) Shop Drawings
shall be
submitted
in
complete
packages grouped
to permit
review
of
related
items
as generally
outlined
in Paragraph 1.7.A.3, below.
4)
Review
of Shop Drawings will be for
conformance
with Contract
Documents
and with regard to functions specified to be provided.
5)
Incomplete
or non-project
specific
submittals
will be rejected.
6) Written
testing and verification
procedures
for
system
performance,
including
acceptance
criteria for OWNER
review and approval prior
to testing.
b. Pre-Submittal
Conference:
CONTRACTOR shall prepare
the
items
listed below for
presentation at the Pre-Submittal
Conference.
The information
shall be
submitted
to ENGINEER three weeks prior to the date of the conference.
1) List of equipment
and materials
required
for the
MCS and the brand and model, which CONTRACTOR
proposes to use for each item.
2) List of proposed
exceptions to the Contract
Documents
along with a brief explanation of each. Approval shall be subject
to a formal
submittal.
3) Sample
of each type of submittal
specified
herein.
The samples
may
be submittals
prepared
for
other
projects.
4) A flow chart
showing the steps to be taken in preparing and coordinating
each
control
system
submittal
to ENGINEER,
and a list of
proposed
submittals.
5)
CPM
schedule for
all control
related activities
from
the
pre-submittal
conference through start-up and training. Particular emphasis
shall be given
to dates
relative
to submittals,
design,
fabrication, programming,
factory testing, deliveries, installation, and field-testing. The
schedule
shall
be subdivided to show activities
relative to each
major
item
or
group of items
when everything in a given group is on the same
schedule.
6) General outlines
of the type of tests
to be performed
to verify that all sensors/transducers, instruments,
and digital processing equip- ment
are functioning properly.
c. Field
Instruments,
Solenoid Valves,
Valves, and other Actuator- Controlled
Devices:
1) Manufacturer’s
product name
and complete model
number
of devices proposed for use, including manufacturer’s name
and address.
2)
Instrument
tag number
in accordance
with the Contract
Documents.
3)
Functional
name.
4)
Manufacturers
standard
catalog
product data.
a)
Catalog
information
shall be tailored
for
this project
by indicating all options and
accessories
provided or
deleting or
crossing out all non-applicable
options
or information.
b)
Provide
electronic editable
copies
(MS Word,
Excel) and paper data sheets conforming
to the latest revision of ISA TR20 specification sheets for review
and approval. For all instrumentation,
provide completely
filled out ISA
TR20 sheets. Incomplete
sheets
or sheets
not
filled
out
using the latest TR20 forms
shall be returned without review and unapproved.
c)
CONTRACTOR
shall include on ISA
TR20 data sheets for all elements
including:
i.
Failure
position for actuator controlled devices
ii.
Indicating
defined failure position for power failure iii.
Indicating
failure
position
for
loss of
control
signal
iv.
Valve
failure is defined
as
loss of power or loss of
signal.
v.
Instrument
failure position
and signal response.
5)
Description
of
construction features.
6)
Performance
and
operation data.
7) Installation,
mounting,
and calibration details;
instructions
and
recommendations.
8)
Service
requirements.
9) Dimensions
of instruments
and
details of mating
flanges and locations of closed tanks, pipe sizes for insertion
instruments,
and upstream/downstream
straight
run pipe lengths required.
10)
Range
of each device and
calibration
information
11)
Descriptions
of materials
of construction
12)
NEMA
ratings for equipment.
13)
Classified
(hazardous)
area ratings d.
Panels,
Consoles, and Cabinets:
1)
Layout
drawings
that include:
a)
Front,
rear, and internal panel views to scale. b)
Dimensional
information.
c)
Tag
number
and functional name
of components
mounted in and on panel, console, or cabinet, as applicable.
d)
Product
information
on panel components.
e)
Nameplate
location and legend including
text, letter size and colors
to
be
used.
f)
Location
of
anchorage
connections.
g)
Location
of external wiring
and piping connections.
h)
Mounting
and installation details, coordinated with actual application.
i) Proposed layouts
and sizes of operator interface graphic display panels.
j) Calculations
substantiating
panel heating and cooling provisions proposed. List and utilize
the following parameters
in the calculations:
i)
Enclosure
dimensions.
ii) Minimum
and
maximum
temperature
outside the enclosure based upon the environmental
conditions given in Article 2.1.B.
iii) Minimum
and
maximum
desired
temperature inside the enclosure based upon the manufacturer’s
stated operating temperature range
of the
panel components.
iv)
Internal
heat
load.
k)
Subpanel
layouts and mounting details
for items
located inside control panels.
2)
Panel
Wiring
Diagrams:
Drawings shall be in accordance with
IEEE standards and
shall include the
following
information:
a)
Name
of each panel, console,
or cabinet. b)
Wire
sizes and types.
c)
Pipe
sizes and types.
d)
Terminal
strip and terminal
numbers.
e)
Wire
color coding.
f) Functional name
and
manufacturer’s
designation
for
components
to which wiring and piping are connected.
3) Control
schematics
shall be in accordance
with convention
indicated in Annex D of NFPA 79. Standardized
wiring
diagrams
that do not
accurately reflect actual wiring to be furnished are unacceptable.
Tables or
charts
for describing
wire numbers
are unacceptable.
4) Stock list
or bill of
materials
for
each
panel
including
tag number,
functional
name,
manufacturer’s
name,
model number
and quantity for components
mounted in
or on
the panel or enclosure.
e.
Field
wiring and piping diagrams,
include the following:
1)
Wire
and pipe sizes and types.
2)
Terminal
numbers at field
devices and in panels.
3)
Fiber
optic termination
designations
in the field and in panels.
4)
Color
coding.
5)
Conduit
numbers
in which wiring will be
located.
6) Locations,
functional
names,
and
manufacturer’s
designations
of items
to which wiring or piping are connected.
7) Point to point
wiring diagrams
shall include all
interconnections
between field devices, panels, control
stations, lighting
panels, and motor starters.
f. Proposed Operator
Interface
and Human
Machine Interface graphic
layouts. Each graphic display
and process
report layout
will be subject to modification
from
CONTRACTOR’s
submitted
format
within limits
of software package used for development.
Implement
such modifications
in accordance
with ENGINEER’s written comments
on the submittal.
There shall
be a minimum
of
three
review cycles
for
OIT and HMI graphics
during
the submittal
phase.
There
is no maximum
to the
number
of reviews of the graphics, if the graphics are not being implemented
as required or do not work as designed.
g.
Programmable
Control System
Information:
1)
System
Description
and documentation:
a)
Detailed
block diagram
showing
system
hardware
configura- tion and identifying model
numbers
of system
components.
b)
Software
listings for operating system,
applications, and HMI. c)
Software
language and organization.
d)
Format,
protocol and procedures for data highway communications and local
communications
with input/output modules and peripheral devices.
e)
HMI
interfacing
details, licensing
structure, and included functions.
f)
Control
and failure modes.
g)
Online
and offline
capabilities
for programming,
system utilities, and diagnostics.
h)
Complete
Input/output
point
listing with I/O module
cross- reference
identification
for
each
programmable
controller,
in
accordance
with the requirements
of Section 40 61 93.
i) Database listing,
including all
I/O points, hard and soft (calculated)
points. Database
shall be
submitted
in an electronically editable
version
for review by the OWNER.
j) Suggested
detailed format and
configuration of log reports, alarm
summaries,
printer outputs,
displays, and graphics.
k)
List
of spare parts and test equipment.
2)
Equipment
Hardware:
a)
Layout
drawings
showing front, rear, end, and plan views to scale of equipment,
I/O components,
power supplies, and peripheral devices.
b)
Construction
details, features and procedures.
c)
Interconnection
diagrams, including
termination
details,
cable
identification
list, and cable
length.
d)
Drawings
showing equipment
layout.
e)
Installation
requirements,
instructions,
and recommendations.
3)
Software
Description:
a)
Licensing
agreement
with name
of licensee, renewal requirements,
release and versions, expiration dates (if any) and upcoming
releases scheduled before Project completion.
When upcoming
releases are expected,
provide
descriptions,
when available, of features that differ from
the
proposed release.
b)
Provide
information
of number
of run, client, and development
licenses as well as
I/O
point count limit
per license.
c)
Standard
technical
and
instructional
documentation
covering software for utility, system support, system
documentation,
display, communications, data logging and storage and diagnostic
functions. Submit
this
information
as electronic files.
d)
Standard
technical
documentation
covering all aspects of the computer
system
software
functions
and capabilities, including
instruction
set
description
and programming
procedures related to monitoring,
display, logging, reporting and alarming functions.
e)
Detailed
functional descriptions
of application programs
explaining control, display, logging and alarming
features to be provided and functions to be performed.
4) Documentation
describing
memory
type, size and structure and listing size of system
memory,
I/O
and
data table memory
and size of memory
available
for control
programs.
Also define estimated
control program
memory
requirements
and processor execution times
and program
scan
times.
5)
Description
of on-line diagnostic tests and off-line tests.
6)
Dimensional
data of equipment.
7)
Hardware
manuals.
8) Manufacturer’s
installation instructions
for grounding and power conditioning requirements.
9)
Description
of how faults are
detected,
isolated, and corrected.
10)
System
I/O
Loop
Wiring
Diagrams:
Prepare Shop Drawings on module-by-module basis and include
the following information:
a)
Rack
numbers,
module
type and slot number,
and module
terminal
point numbers.
Include
location
and
identification
of
intermediate
panel
and field
terminal
blocks and terminal
numbers
to which I/O wiring
and
power supply wiring is connected. Identify power supply
circuits with designation numbers
and ratings.
b)
Wiring
sizes, types, wire numbers,
and color coding.
c)
Designation
of conduits in which field I/O wiring
will
be installed.
d)
Location,
functional name,
tag numbers and manufacturer’s
module numbers of panel and field
devices and instruments
to which I/O wiring will be connected. For discrete I/O devices use
NFPA 79 electrical symbols
tagged with designation as shown.
e)
Prepare
loop
wiring
diagrams
in accordance with ISA 5.4, Figure 6 showing loop diagram,
shared display and control, minimum
required items
plus all optional items.
f) Addressing card
and system
layout,
including special configuration rules and limitations.
g)
Interface
and
cable data.
h)
Indicated
modularity of I/O modules.
h. Complete
point-to-point interconnection
wiring diagrams
of field wiring associated
with the
system.
Diagrams
shall include the following:
1) Field wiring
between each equipment
item,
panel, instruments,
and other devices, and wiring to control
stations,
panelboards,
and
motor starters.
Some
of this equipment may
be specified in other Divisions. CONTRACTOR is responsible
for providing complete point-to-point interconnection wiring
diagrams
for control and monitoring of that equipment.
2) Numbered
terminal
block and terminal
identification
for each wire termination.
3)
Identification
of assigned wire
numbers
for interconnections.
Assign each wire a
unique
number.
4) Schedule showing
the wiring numbers
and the conduit number
in which the numbered
wire
is installed.
5)
Junction
and pull boxes through
which
wiring will be routed.
6)
Identification
of equipment in
accordance
with the Contract
Documents.
7)
Instrument
tag numbers
from
Contract
Documents.
8)
Manufacturer’s
model,
product, or catalog number
for each item.
9)
Location
of each item.
10)
Signal
type and calibrated range, scale, and set point for each item,
as applicable.
11)
Transmitter
output drive and receiver input impedances.
Show total loop impedance
and reserve.
12)
Identification
of all loop
and
instrument energy sources.
3.
Samples:
a. Color charts
for
finish
paint for
metallic
panels.
Provide
full range of paint manufacturer’s
standard and custom
colors.
Color selection will be by ENGINEER.
b. Color charts
for
fiberglass-reinforced
panels. Provide full range of panel manufacturer’s
standard and custom
colors.
Color selection will be by ENGINEER.
4. Factory
Acceptance Test Procedure: Submit
proposed procedures for factory testing required
to comply
with the Contract
Documents.
Test procedure shall include
the
following:
a.
Visual
inspection of components and assembly.
b.
Description
of
hardware
operational testing.
c.
Description
of software demonstration.
d.
Description
of testing equipment
to be used. e.
Sign-off
sheets to be used at time
of testing.
B.
Informational
Submittals:
Submit
the following:
1. Documents
to be submitted
prior to pre-submittal
conference, in accordance
with Article 1.3 of this specification.
2. System
Software
Documentation:
Submit
preliminary
software documentation
at least four
weeks prior
to expected
initiation
of factory testing. Submittal
shall be for OWNER
and ENGINEER for information
only and shall not be subject to formal
approval. Software
documentation
shall include
the
following:
a. Complete
hard copies of all
ladder diagram
programming.
Docu- mentation
shall include complete
external
and internal
I/O
coil, contact,
and signal
cross-referencing, addressing,
and rung numbering.
Documentation
shall clearly distinguish
between internal
and real I/O and shall also
incorporate extensive
English language to identify
contact, coil and signal functions and
for labeling and description of program,
sub-program
and
rung purpose and action.
b. Complete
listing of external and internal I/O address assignments, register
assignments,
and preset constant values along with functional
point descriptions. Also, list all unused/undefined I/O and data
table registers
available.
c. Complete
hard copies of all program
documentation
for all types of programs.
d. Detailed system
memory
map
defining memory
segments
used and spare memory
segments
available for system
memory,
I/O tables, Data Tables and control program.
e. Complete
database
listing
including
listings
for
log,
report, and
alarm file
setups.
f. Hard copies of
all system graphic
displays and formats
for all logs, reports and the alarm
summary.
g. User's
manuals
describing procedures
and providing examples
for use of operator's
consoles, workstations
and programming
terminal,
accessories
and system
utility
routines
to
perform control, display
and logging program
generation,
program
modification,
program verification,
diagnostics,
program
documentation,
loading and backup and other required system
support
functions.
3.
Manufacturer’s
Instructions:
a.
Shipping,
handling, storage, installation,
and start-up instructions.
b. Templates
for anchorage devices for
materials
and
equipment
that will be anchored to concrete or masonry.
4.
Source
Quality Control
Submittals:
a.
Results
of factory testing.
5.
Special
Procedure
Submittals:
a. Notification
to OWNER
and ENGINEER at least 14 days before readiness to begin system
checkout
at the
Site.
Schedule
system checkout on dates acceptable to OWNER and ENGINEER.
b. Written
procedure for system
checkout.
Submit
not less than
90
days prior to starting system
checkout.
c. Ninety days prior
to starting system
checkout
submit
written procedure for start-up.
6.
Field
Quality Control Submittals:
a. Submit
the following prior to commencing
system checkout and start- up.
1)
Completed
calibration
sheets
for
each
installed instrument
showing five-point calibration (zero, 25, 50,
75,
100 percent of span), signed by factory-authorized serviceman.
b.
Field
calibration reports c.
Field
testing reports.
7.
SUPPLIER’s
Reports:
a.
Installation
inspection
and check-out report.
b. Submit
written report of results of
each
visit to Site by SUPPLIER’s service technician, including purpose
and time
of visit, tasks performed,
and
results obtained. Submit
within two days of completion
of
visit
to the
Site.
8.
Qualifications
Statements:
a.
SYSTEM
INTEGRATOR.
b.
SUPPLIER.
c.
Manufacturers,
when required by ENGINEER.
C.
Closeout
Submittals:
Submit
the following:
1. Furnish
Operations and Maintenance Manuals for
the MCS in accordance
Section 01 78 23, Operation and Maintenance Data and the supplemental
requirements
as follows:
a. Complete
list
of
supplied
system
hardware
parts
with full
model
numbers
referred to system
part
designations,
including spare parts and test equipment
provided.
b. Copy of all
approved submittal
information
and system
Shop
Drawings as specified herein with corrections
made
to reflect actual system
as
tested and delivered to the site for installation. Half-size black
line reproductions shall be provided for all
Shop Drawings larger than 11 by
17-inches.
c.
Complete
up-to-date system
software
documentation.
d. Manufacturer's
Original Copies of
Hardware,
Software and Installation, Assembly
and
Operations Manuals for
the distributed control system central monitoring
station and peripheral devices, and all other control system
components.
Manuals shall include the following information:
1) General
descriptive
information
covering the basic features of the equipment.
2) Physical
description covering layout and installation requirements
and all environmental
constraints.
3) Functional and
operational descriptions
covering
the
procedures for programming,
operation, start-up,
shutdown,
and calibration of the distributed control system
equipment
and explaining how the various control functions are performed.
4) Principles of
operation
explaining
the logic of operation; provide information
covering operation to a component
level.
5) Maintenance
procedures covering checkout, troubleshooting,
and servicing; checkout procedures shall provide the means
to verify the satisfactory operation of
equipment,
troubleshooting procedures shall serve as a guide in determining
faulty components
and servicing procedure
shall
cover
requirements
and
recommended
time
schedule for calibration, cleaning, lubrication and other
housekeeping and preventive
maintenance
procedures.
6)
Wiring,
schematic
and logic diagrams.
7) Safety
considerations relating to operation and maintenance
procedures.
2.
Record
Documentation:
a. CONTRACTOR shall
revise all system
Shop
Drawings,
submittals,
and software documentation
to reflect as-built conditions in accordance
with the
requirements
of the Section 01 78 39, Record
Documents and
the supplemental requirements
below.
CONTRACTOR
shall obtain the services of the SYSTEM INTEGRATOR
and other SUPPLIERS to assist
with these requirements.
b. Five copies of
all revised Shop Drawings and documentation
shall be submitted
to the
ENGINEER to replace out-dated
drawings and
documentation
contained in the System
Operation
and Maintenance Manuals. Half-size
black
line
sets
shall
be provided for all drawings larger than 11 by17-inches. Specific
instructions
for out-dated drawing removal
and replacement
shall be
provided
with the Record Drawing submittal.
c. Half-size black
line
prints
of wiring
diagrams
applicable to each control panel shall be
placed inside a clear
plastic
envelope
and stored in a suitable
print
pocket or
container
inside
each control
panel.
d. Markups shall
be maintained
and submitted
electronically; hand
drawn copies shall not be accepted.
e. Prior to
commissioning,
CONTRACTOR
shall furnish to ENGINEER
three
copies
of
an
installation
inspection
report certifying
that
all
equipment
has been installed correctly
and is operating properly. The report
shall
describe
the
inspection
and
test procedure and include any repairs, modifications
or other work performed
during the factory test and commissioning.
The format
of the report shall be submitted
for review and approval prior
to notification of commencement
of any test or loop check. CONTRACTOR shall provide two
weeks notice to ENGINEER of intent to commence testing.
The
report shall be signed by the CONTRACTOR and the system
Supplier’s
authorized
manufacturer’s
representative.
1) Loop/Component
Inspections and Test Report: Each
loop shall have a Loop Status Report to organize
and track its inspection, adjustment,
and calibration. These reports shall include the following
information
and checkoff items
with spaces for signoff
by the system Supplier:
a)
Project
Name. b)
Loop
Number.
c)
Tag
Number
for each component
in each loop. d)
Checkoffs/signoffs
for each component.
i)Tag/Identification
ii)Installation
iii)Termination
– wiring iv)Calibration/Adjustment
2)
Checkoffs/signoffs
for
the loop:
a)
Panel
interface
terminations
b)
I/O
interface
terminations
c)
I/O
signal operation
d) Inputs/outputs
operational:
received/sent processed, adjusted
e)
Total
Loop
operation
3) Summary
of Functional requirements
for each component: a)
For
indicators
and recorders: Scale and chart ranges
b) For transmitters/converts:
Scale and chart ranges
c)
For
computing
Elements:
Function
d)
For
controllers: Action (direct/reverse)
control modes
(PID)
e)
For
switching
elements:
Unit range, differential
(FIXED/ADJUSTABLE),
reset (AUTO/MANUAL)
f)
For
I/O Modules: Input or output
4)
Calibrations:
a) For analog
Devices: Required
and
actual
inputs
and
outputs
at 0, 25, 50, 75, and 100 percent
of span, rising
and falling.
b) For Discrete
Devices: Required and actual trip points and reset points
c)
For
Controllers: Mode
Settings (PID)
d)
For
I/O modules:
Required and actual inputs or outputs for
0, 25, 50, 75, and
100 percent of span, rising and
falling.
5)
Space
for comments
6)
Space
for signoff by MCS
Supplier
f.
CONTRACTOR
shall submit
to the
ENGINEER certified calibration certificates for field instruments
and
devices specified in Section 40 70
05, Primary
Sensors and Instruments,
and panel mounted devices specified in Section 40 78 00, Panel
Mounted Instruments
and Devices, prior to start up.
1) Receipt of any
calibration
certificate
shall in no way imply
acceptance of any work or instrument.
2) The calibration
certificates
shall be prepared
and submitted
by the CONTRACTOR and shall contain
the
information
shown on the sample
calibration
certificate included
at the end of this section.
3) Each calibration
certificate
shall
be signed and dated by the authorized manufacturer’s
representative
and the CONTRACTOR. Completed
certificates
shall
be
submitted
to
ENGINEER.
g. Prior to startup
and commissioning,
the
entire installed instrument
and control system shall be certified
that
it
is
ready
for
operation.
All
preliminary
testing, inspection, and calibration shall be complete
and documented.
The system Supplier shall
submit
a written letter
stating
the system
is
“READY”
for
operation.
h. At conclusion of
startup and commissioning,
CONTRACTOR shall submit
a written letter stating
that all
equipment
has been commissioned
correctly and is operating properly.
1)
Prepare
and submit
record documents
in accordance
with Section
01 78 39, Record
Documents.
2) Revise all MCS
Shop Drawings
to reflect as-built conditions in accordance
with the following.
a) Use "as-built"
updates of approved Shop
Drawings and submittals
in operation and maintenance
manuals.
b) Half-size
black
line
prints
of
wiring
diagrams
applicable to each control panel shall be placed
in
clear
plastic
envelopes
inside a suitable print pocket
or
container
inside
each
control panel.
c) Submit
drawings of the
point-to-point
interconnection wiring diagrams
updated to reflect
final as-built equipment
information
and as-installed
field
installation
information.
D.
Maintenance
Materials
Submittals:
Submit
the following:
1. Spare Parts and
Test Equipment
a. General
1) Furnish the spare
parts and test equipment
in accordance with the Contract Documents,
identical to and
interchangeable
with similar
materials
and equipment
provided for the MCS as part of the Work.
2) Provide source
quality control for
spare parts as part of factory testing prior to shipment
of process control system equipment.
3) For process
sensors and other analog
instruments,
SUPPLIER shall submit
a separate quotation for recommended list of spare parts and test
equipment.
Separately
list
and price each item recommended.
Spare parts quotation shall include
a
statement
that prices quoted
are valid for a
period of one year from date of equipment
installation and that SUPPLIER
understands
that OWNER reserves the right to purchase none, any, or
all
parts quoted. Upon request, SUPPLIER
shall
submit
documentation
that stock of spare parts and test equipment
is obtainable within 48 hours of receipt of
OWNER’s
order.
b.
Furnish
the following
spare parts:
1) Five of each
type
of relay (control
relay, time
delay relay, and
current
alarm relay) for each quantity
of forty or fraction thereof provided as part of the Work.
2)
One of
each type of PAC input/output
module
or card used.
3)
One of
each type of PAC communication module
or card used.
4) One replacement
power supply for
each
type and size provided as part of the Work.
5)
One-year
supply of all expendable or consumable
materials.
6) One per quantity
of
five
or fraction
thereof
of
gauges,
indicators, switches, and
limit
switches
provided, complete
with extension arms,
diaphragm
seals,
filled
and ready
to use.
7) One per quantity
of ten
or fraction
thereof
provided,
per range
of field instruments
including insertion
type
instruments.
No spares
are required for inline instruments
such as magnetic
flow meters
and flumes
or venturis that include
flow tubes through which flow is conveyed.
8) One per quantity
of ten
or fraction
thereof
provided
of
sensors
and targets including, but not limited
to, all sensors and targets used in the chain and flight monitoring
system.
9) Twelve of each
type and
size
of fuse used in panels and instruments.
10)
Six of
each type and size of breaker used
in panels and instruments.
c.
Furnish
the following
test equipment:
1) One of each set
of special tools required
to insert,
extract, and connect internal or external connectors,
including edge connectors.
3) One set of
special calibration equipment
required for system calibration.
d.
Furnish
the following
communicators, drivers, and software:
1) Provide two sets
of all tools
including, but not limited
to, communicators, remotes,
and similar
devices. Provide software and drivers available from
the
manufacturer
for all instrumentation.
The software
functions include, but are not limited
to, configuration, communication, testing,
calibration, verification, troubleshooting, diagnostics, and
printing.
1.8
DELIVERY,
STORAGE,
AND HANDLING
A. CONTRACTOR shall
make
all arrangements
for transportation, delivery, and storage of the equipment
and materials
in accordance with Section 01 60 00, Product
Requirements,
of the system
SUPPLIER,
and
requirements
of equipment
manufacturers.
B. Prior to
packaging,
each
manufacturer
or
SUPPLIER shall securely attach tag number
and instructions for proper field handling and installation to each
instrument.
C. MCS equipment
shall be packaged at the
factory, prior to shipment,
to protect each item
from
damage
during shipment
and storage. Containers shall be protected against impact,
abrasion,
corrosion, discoloration, and other damages.
Clearly label contents
of each container and provide
information
on the required storage conditions necessary
for
the equipment.
D. CONTRACTOR shall
make
arrangements
to store MCS equipment
in accordance with Section 01 60 00, Product
Requirements and
manufacturer’s
instructions and relevant organization standards. SUPPLIER
shall notify CONTRACTOR,
in
writing, with copies to OWNER and ENGINEER of the storage
requirements
and recommendations
for the equipment
prior to shipment.
PART 2 –
PRODUCTS
2.1
GENERAL
PROVISIONS
FOR PRODUCTS
A.
Power
Supplies:
1. All
electrically-powered
equipment
and
devices shall be suitable for operation on 115-volt plus-or-minus
10 percent,
60 Hertz plus-or-minus
two Hertz power. If different voltage or closer regulation is
required,
provide suitable
regulator
or transformer.
2. Provide
appropriate power
supplies for all two-wire transmitters,
loops for monitoring
discrete
inputs
and necessary
outputs. Install power supplies mounted
in
enclosures,
and
install
in
appropriate
control room or field panel.
3. Power supplies
shall be suitable
for
minimum
of 130 percent of the maximum
simultaneous current draw.
4. Provide power
on-off switch or
air circuit
breaker
for each item requiring electrical power.
5. Provide isolation
transformers,
line voltage regulators and power distribution panels for the
distributed
digital portions of the MCS to eliminate
electrical noise
and/or transients
entering on the primary
power line.
B.
Signal
Requirements:
1. Unless otherwise
shown or indicated
in the
Contract Documents,
control system
shall
be furnished to use 4 to
20
mA
DC
analog
signals
with HART protocol.
2. Provide signal
converters and repeaters
where required. Analog inputs to distributed control system shall be
through
appropriate repeaters to provide signal isolation where series-looped
with other devices and to allow loop to maintain
integrity even when distributed
control system
is out
of service. Power supplies shall adequate for signal
converter and repeater loads.
3. Signals
shall be isolated from
ground.
4. Signals shall not
have a transient DC voltage exceeding 300 volts over one millisecond
nor a DC component over 300 volts.
5. The system
and
associated input/output wiring will
be
used in a facility environment
where there can be high-energy
AC fields, DC control pulses, and varying ground potentials between
the sensors/transducers or input contact locations and system
components.
The system
design
shall be adequate
to
provide
proper
protection
against
interferences from
all
such possible
situations.
C.
Miscellaneous:
1. Instrumentation
and MCS components
shall
be heavy-duty
types,
suitable for continuous
service in
a
municipal
wastewater treatment
plant environment.
Furnish
products that are currently in production at the time
products are shipped from the factory. All equipment
furnished shall be of modular construction and be capable of
field
expansion through
installation of plug-in circuit cards and additional
cabinets
as
necessary.
Logic and control loops shall be fail-safe.
2. Instrumentation
and other MCS components shall return
automatically
to accurate measurement
within 15 seconds
upon restoration of power after a power failure, and when transferred
to standby power supply.
3. Provide surge
protection for instruments
and all other MCS components that could be damaged
by electrical surges.
4. Field-mounted
instruments
and MCS
components
shall be suitable for installation in humid
and corrosive service conditions.
Field-mounted
instrument
enclosures, junction boxes, and appurtenances shall comply
with NEMA 4X requirements,
unless otherwise shown or specified.
5. Relays with
interconnections to
field
devices shall be wired through terminal
blocks. Terminals
as part of
the
relay base are unacceptable.
6. Panel mounted
instruments,
switches,
and
other devices shall be selected and arranged to present a
pleasing
coordinated appearance.
Front-of-panel-
mounted devices shall be of the same manufacturer
and model
line.
7. All components
furnished, including
field-mounted
and rear-of-panel instruments,
shall
be
tagged
with
the
item
number
and nomenclature
as shown and the instrument
index
in the
Contract Documents.
8. Ranges and scales
specified in the Contract
Documents
shall be coordinated to suit equipment
actually furnished. Range, scale, and set point values specified in
other Sections of Division
40 are for initial setting and configuration. Coordinate
specified
values with
actual
equipment
furnished to implement
proper and stable process
action as systems
are placed in operation.
9. Device
circuitry shall
be treated
with conformal
coating.
10. Field-mounted
devices shall be protected
from
exposure
to freezing temperatures.
D.
Environmental
Conditions:
1. MCS and its
components
shall be designed and constructed for continuous operation under the
following temperature
and humidity
conditions:
a.
Equipment
and Devices Installed in Control
Rooms:
1)
Ambient
Temperature: 60 degrees F to 80 degrees F normal
range;
and 40 degrees F to
105 degrees F occasional maximum
extremes.
2)
Relative
Humidity:
80 percent, normal; 95 percent maximum.
b. Equipment
and devices installed at
indoor
locations (other than control rooms)
for digital processing equipment
hardware, control panels, and instruments:
1)
Ambient
Temperature: 40 degrees
F to 120 degrees F.
2)
Relative
Humidity:
98 percent
maximum.
c.
Equipment
and Devices Installed Outdoors:
1)
Ambient
Temperature: -20 degrees F
to 120
degrees F.
2)
Relative
Humidity:
100 percent maximum.
E. Refer to other
Division
40
specifications for product
requirements
for
materials
and equipment that are
part of the MCS.
PART 3 –
EXECUTION
3.1
GENERAL
PROVISIONS
FOR EXECUTION
A.
Refer
to other Division
40
specifications for execution requirements
for the MCS.
3.2
ATTACHMENTS:
A. Refer to Appendix
B of the contract for
a listing of the contents of PLC PR, the Allen-Bradley PLC-5 which
shall be replaced
under this contract. Refer to and follow the requirements
of Appendix C for the NEORSD Automation
Standards and Conventions Manual, and refer to and
follow the requirements of Appendix D for the NEORSD Object Library
Users Manual.